Field Hockey – News /news Wed, 25 Jan 2023 20:40:59 +0000 en-US hourly 1 https://wordpress.org/?v=7.0.3 /wp-content/themes/b/bates-framework/styles/images/bates-favicon.png Field Hockey – News /news 32 32 Video: From coach to teammate, a ֲý field hockey story /news/2021/12/15/video-from-coach-to-teammate-a-bates-field-hockey-story/ /news/2021/12/15/video-from-coach-to-teammate-a-bates-field-hockey-story/#respond Wed, 15 Dec 2021 19:02:03 +0000 /news/?p=143492 Anna Cote ’25 of Auburn, Maine, and Emily Gianunzio ’22 of Darien, Conn., pose on and by the ֲý Bobcat.They are field hockey teammates this year; last year, Gianunzio, on a one-year leave from ֲý because of the pandemic, coached Cote when the latter was a senior at St. Dom’s.How Emily Gianunzio went from being Anna Cote's high school field hockey coach to her Bobcat teammate.]]> Anna Cote ’25 of Auburn, Maine, and Emily Gianunzio ’22 of Darien, Conn., pose on and by the ֲý Bobcat.They are field hockey teammates this year; last year, Gianunzio, on a one-year leave from ֲý because of the pandemic, coached Cote when the latter was a senior at St. Dom’s.

In fall 2020, Emily Gianunzio of Darien, Conn., was about to start her senior year at ֲý and her final year of Bobcat field hockey.

Then came the pandemic, which shut down NESCAC athletics. So Emily Gianunzio did what others have done in the conference, deciding to take a year off from school in order to return in this fall and play for the Bobcats. 

At the time, she was already renting a house with friends from ֲý, so she stayed in town. There was just one thing she needed: a job.

Luckily, Saint Dominic Academy in Auburn needed an assistant coach for its season and ֲý head coach Dani Kogut connected Emily with the Saints.

One Saints player was especially eager to have Gianunzio come aboard: senior captain Anna Cote of Auburn, whose older sister Paige was already a Bobcat.

“I knew (Emily) was such a talented player and would bring such a good skill set to the team,” said Cote, who had her own sights set on attending ֲý, like her sister. “I was really excited for her to come coach.”

Gianunzio and the Saints learned a lot from each other.

“It was really nice to have Emily there as an extra explainer,” Saints head coach Abi Bowie said. “It was great to have a younger person there with me that the girls can connect with and also talk about college because she’s in it.”

Gianunzio learned that coaches go through a lot more than what you see on the field each day.

“Having to navigate team culture stuff, not being a player, I recognize is harder, because I had the experience of dealing with that last year,” Gianunzio said. “I really gained an appreciation for what coaches do behind the scenes.”

This fall, Cote enrolled at ֲý with the Class of 2025, and Gianunzio returned to ֲý for her senior year, going from Cote’s coach to her teammate.

Anna Cote ’25 of Auburn, Maine, and Emily Gianunzio ’22 of Darien, Conn., pose on and by the ֲý Bobcat.

They are field hockey teammates this year; last year, Gianunzio, on a one-year leave from ֲý because of the pandemic, coached Cote when the latter was a senior at St. Dom’s.
Anna Cote ’25 of Auburn, Maine, and Emily Gianunzio ’22 of Darien, Conn., pose on the ֲý Bobcat on Dec. 8. Field hockey teammates this year, they had a player-coach relationship at St. Dominic’s last year. (Phyllis Graber Jensen/ֲý College)

“When she was my coach, I was looking up to her so much, helping to make our team a lot better and grow,” Cote said. “And this year it was about playing together and putting our minds together to make plays out there on the field.”

They made plenty of plays, with Gianunzio finishing second on the team in points and Cote being voted the program’s MVP among the first-years and sophomores by her teammates.

Gianunzio’s senior thesis in psychology focuses on the correlation between athletic performance and the ability to pay attention. She is considering going into coaching after she graduates this spring, and her current coach is all for it.

“I think that’s a really great field for her, it gets her to pair two passions of hers, both athletics and psychology,” Kogut said. “Whether she’s coaching or not she’ll definitely use that.”

Emily Gianunzio ’22 (left) chose Anna Cote ’25 (right) to help bind her senior thesis — sealed, per ֲý tradition, with a kiss.
]]>
/news/2021/12/15/video-from-coach-to-teammate-a-bates-field-hockey-story/feed/ 0
Video: ‘Thankful’ Bobcat athletes kick off first practices of 2021 /news/2021/08/27/video-thankful-bobcat-athletes-kick-off-first-practices-of-2021/ /news/2021/08/27/video-thankful-bobcat-athletes-kick-off-first-practices-of-2021/#respond Fri, 27 Aug 2021 16:57:38 +0000 /news/?p=141445 Perhaps the feelings of fall varsity athletes can be summed up by…]]>

Perhaps the feelings of fall varsity athletes can be summed up by the words on a whiteboard in Alumni Gym, where new head coach Emily Hayes leads the ֲý volleyball program.

Under the header “Practice 1” on Wednesday, it read, “Thankful.”

“You will hear the same thing from everyone,” said field hockey forward Emily Gianunzio ’22 of Darien, Conn. “This is amazing. To be together on the field has been great.”

The ֲý fall sports teams haven’t played an actual intercollegiate game since 2019. Last year, they practiced, but with masks.

Video by Aaron Morse

The first practices of the year were Wednesday. First up was men’s soccer, which took to the Garcelon Field turf at 7 a.m., the first time without masks in two years.

Head coach Tyler Sheikh was ready to put his team to the test, with a challenging conditioning session to start the morning off right.

“It’s time to kick their butts a little bit,” said Sheikh.

ֲý men’s soccer was the first of four practices for fall sports on Wednesday, as the Bobcats get ready for what promises to be a fun .

We were on-hand to capture all the excitement of men’s soccer, field hockey, women’s soccer, and volleyball’s return to action.

]]>
/news/2021/08/27/video-thankful-bobcat-athletes-kick-off-first-practices-of-2021/feed/ 0
Miles apart, still together: Here’s how ֲý coaches and athletes stay Bobcat strong /news/2020/04/17/miles-apart-still-together-heres-how-bates-coaches-and-athletes-stay-bobcat-strong/ /news/2020/04/17/miles-apart-still-together-heres-how-bates-coaches-and-athletes-stay-bobcat-strong/#respond Fri, 17 Apr 2020 17:27:23 +0000 /news/?p=132392 So much has changed during the COVID-19 pandemic, but some things remain the same. "We may be miles apart, but we still accomplish things together," says ֲý rower Emma Vieten '22. Like zoom yoga, virtual team dinners, and more.]]> ]]> /news/2020/04/17/miles-apart-still-together-heres-how-bates-coaches-and-athletes-stay-bobcat-strong/feed/ 0 Video: Three great moments for Bobcat sports this week /news/2017/10/27/bobcats-dominate-head-of-the-charles-earn-dramatic-wins-at-colby/ /news/2017/10/27/bobcats-dominate-head-of-the-charles-earn-dramatic-wins-at-colby/#respond Fri, 27 Oct 2017 07:46:02 +0000 /news/?p=110711 Good things happen in threes. So do great things, especially for Bobcat sports this past week. Take a look]]>

Good things happen in threes. So do great things, especially for Bobcat sports this past week. Take a look:

1. Women’s rowing captures Head of the Charles title

Guided by senior coxswain Hanna De Bruyn of Old Lyme, Conn., the ֲý women’s varsity eight set a course record on Oct. 22 to win the women’s collegiate eights at the prestigious Head of the Charles Regatta.

De Bruyn and her crew navigated the serpentine 4,800-meter course on the Charles River in 16:01.182, outpacing last year’s Head of the Charles winner Wesleyan by 16.863 seconds.

ֲý women’s rowing captured the women’s collegiate eights at the Head of the Charles on Oct. 22. (Photograph by Daniel D’Ottavio)


2. Men’s soccer qualifies for NESCACs with amazing goal vs. Colby

The ֲý men’s soccer team heads to the NESCAC championship tournament thanks to a miraculous goal scored in the final minute of the Bobcats’ regular-season finale at Colby on Wednesday afternoon.

Sophomore Beaufils Kimpolo-Pene of the Bronx, N.Y., knocked in the rebound of his initial saved shot with 24 seconds left in the second overtime period.

ֲý plays at top-seeded Tufts Saturday at 2:30 p.m. in the NESCAC quarterfinals.


3. Field hockey also beats Colby, in final seconds, to earn NESCAC bid

For the third straight year, the ֲý field hockey team beat Colby in the final game of the season to earn a spot in the NESCAC tournament. Here’s what it looked like:

With the win, ֲý earns the eighth seed in the NESCAC tournament and visits top seed and No. 2 nationally ranked Middlebury on Saturday. The NESCAC quarterfinal match is set for 12:00 p.m.

]]>
/news/2017/10/27/bobcats-dominate-head-of-the-charles-earn-dramatic-wins-at-colby/feed/ 0
Campus Construction Update: Sept. 2, 2016 /news/2016/09/02/campus-construction-update-sept-2-2016/ /news/2016/09/02/campus-construction-update-sept-2-2016/#respond Fri, 02 Sep 2016 15:28:46 +0000 /news/?p=102956 With 55-65 Campus Ave. open and 2016's other major projects all but complete, Campus Construction Update says "so long" until the next big build comes along.]]>

Taken at the unfinished Campus Avenue Field in mid-August, this image shows the concrete channel into which the edge of the GreenFields TX turf would be tucked and secured. At right is the TenCate Ecocept elastic layer, which is unique in North America — at least for now. (Doug Hubley/ֲý College)

In the new and improved Smith Hall showers, fancy metalwork decorates the drain troughs and a tiled barrier ensures that bathers don't have to stand in each others' runoff. (Doug Hubley/ֲý College)

A field hockey practice on the new GreenFields TX turf on Campus Avenue Field on Sept. 1, 2016 . (Doug Hubley/ֲý College)

Field hockey balls on the GreenFields TX turf on Sept. 1, 2016, the second day of practice on the new surface. (Doug Hubley/ֲý College)

There's no doubt whose this new turf this is. (Doug Hubley/ֲý College)

We’ve been together 18 months, but now our time’s running out.

Our hearts are heavy. It’s hard not to regret the places we never saw together, the experiences we never had, the pleasures left untried. The things we wanted to tell you about, but couldn’t.

Such as the conversion of Carnegie 225 from tiered to level seating. The new steam pipe between Chase Hall and the Muskie Archives. And the new windows on Chase — 100 new energy-efficient windows.

There's no doubt whose this new turf this is. (Doug Hubley/ֲý College)

There’s no doubt whose this new turf this is. (Doug Hubley/ֲý College)

Since March 2014, it has been our pleasure to give you the news of major facilities improvements at ֲý. But with the new Campus Avenue dorms open and the summer’s three remaining projects virtually complete, it’s time for Campus Construction Update to end this series and return to honest — er, other communications work.

Yet we still have a few intimacies to share with you before we pack up the 8-foot ladder, leave our hard hat and orange safety vest rolled up and stashed behind your couch, and call it a day.

On Wednesday, Aug. 31, the ֲý field hockey team held its first practice on a newly resurfaced Campus Avenue Field. In fact, it was the first practice in North America for any team on this specific configuration of GreenFields TX turf.

While this acclaimed turf by the Dutch manufacturer GreenFields is in use elsewhere on the continent, ֲý’ Campus Avenue Field is the only installation employing the proprietary TenCate Ecocept elastic layer — the shock-absorbing layer that underlies the faux grass.

A mixture of recycled rubber and plastic bound with polyurethane, the Ecocept product imparts superior playing qualities and drainage to the turf, says field hockey coach Danielle Ryder.

A field hockey practice on the new GreenFields TX turf on Campus Avenue Field on Sept. 1, 2016 . (Doug Hubley/ֲý College)

A field hockey practice on the new GreenFields TX turf on Campus Avenue Field on Sept. 1, 2016 . (Doug Hubley/ֲý College)

“It’s a very nice turf in terms of playability and bounce and speed,” she says. “And it’s a very fast turf. That’s going to be really useful when we go play on slower turfs, because we’ll be used to performing fast.”

The TX is also, simply, a consistent surface. It will enable the team to focus exclusively on playing without the distractions from the worn-out AstroTurf that it replaced.

The old turf’s irrigation system — field hockey is played on wet turf — left puddles that would stop the ball dead. There were frayed spots and other irregularities in the playing surface that sent balls flying wildly and tripped players. (The Bobcat emblem in the middle was a particular tripping hazard.)

Most important, Ryder explains, the GreenFields is “physically a lot more forgiving to the players’ bodies. The old turf was really hard to play on.”

The last major task at Campus Avenue Field was completed early this week: fastening the grassy layer in place. This was done by securing the edge of that carpet into a channel cut into a concrete anchor wall that surrounds the field and whose top is flush with ground level.

Panels of the GreenFields TX turf were still being placed on Aug. 17, 2016. Slathered with glue, this tape was used to hold the panels together. (Doug Hubley/ֲý College)

Panels of the GreenFields TX turf were still being placed on Aug. 17, 2016. Slathered with glue, this tape was used to hold the panels together. (Doug Hubley/ֲý College)

Other than that, the finishing touches were cosmetic — touchups to markings on and around the field. Ryder points out an interesting distinction among the markings: Curved lines, like the shooting circle, are painted on, and straight-line markings are inset and glued into the surface.

That’s because curved seams don’t hold up as well as straight seams.

The renewed field is a tremendous morale boost. “It’s a huge advantage to have a brand-new facility,” Ryder says. “And it’s definitely a vote of confidence.”

The Bobcats make their competitive debut on the new turf in a game vs. Worcester State at 5 p.m. Sept. 6.

"It's a cathedral," says rowing coach Peter Steenstra: The boat storage area in the boathouse. The wood on the floor was recovered from ֲý' old boathouse for decorative use in the new facility. (Doug Hubley/ֲý College)

“It’s a cathedral,” says rowing coach Peter Steenstra: The boat storage area in the boathouse. The wood on the floor was recovered from ֲý’ old boathouse for decorative use in the new facility. (Doug Hubley/ֲý College)

Focused on racks: ֲý’ new boathouse will be the last of the college’s big summer facility projects to cross the finish line.

Rowing coach Peter Steenstra reports that the all-important boat storage racks will be installed during the week of Sept. 12. That date falls two days after the teams’ first practice, and a few weeks past the original installation schedule.

Sideboards from the old boathouse were saved, planed, and resized for reuse in the new boathouse team room, shown here, and in a connecting corridor. (Doug Hubley/ֲý College)

Sideboards from the old boathouse were saved, planed, and resized for reuse in the new boathouse team room, shown here, and in a connecting corridor. (Doug Hubley/ֲý College)

But the delay is a good thing. The racks are being custom-made for ֲý and their designer-fabricator, Focus Rack Systems of Nashville, Mich., is taking the time it needs to get them right.

The racks are distinctive in one way, and probably unique in a second way. As noted in previous updates, the first distinction lies in a drawer-like action in the supporting arms that allows the boats to slide out and in for easy storage.

The unique feature? Each rack has three arms that support boats: bow, center, and stern. But the Focus rack’s center arm can be moved along the boat’s length. That’s to accommodate different arrangements of the so-called outriggers, gunwale-mounted fittings that support the oarlocks.

Because outrigger placement varies from boat to boat and the boats are racked upside-down, the movable arm will simplify boat storage in tight quarters and reduce the risk of damaging the delicate craft.

“That’s something they’ve never done, so they’re kind of excited about it,” says Steenstra, who worked with Focus proprietor Paul Smith on the innovation. “It’s the first of its kind.”

We dropped by the boathouse site, by the Androscoggin River in the town of Greene, on Aug. 30. Project management firm Consigli Construction still had a field office there, but the construction fence was gone and the landscaping done: paving stones placed in the parking area, trees and bushes planted, grass seed under a blanket of straw panting for rain.

Painters were finishing up the exterior of ֲý' new boathouse on Aug. 30, 2016. (Doug Hubley/ֲý College)

Painters were finishing up the exterior of ֲý’ new boathouse on Aug. 30, 2016. (Doug Hubley/ֲý College)

It was gratifying to see that something of the old boathouse lives in the new one: The rustic wainscoting and ceiling trim fabricated from the sideboards of the old boathouse, which was torn down a month ago.

Wainscoting and all, the new boathouse is beautiful, says Steenstra. “Particularly the inside, with the main boat bays,” he says, adding with a laugh, “It’s a cathedral.”

To passers-by, the structure sets the right tone. Set in a rolling field a few hundred yards from a working farm, the boathouse fits its rural setting. “When you’re driving by, you’re going to see what looks to be a very large barn,” Steenstra says. “But get a little closer and you start to realize what it is.”

A grand opening for the boathouse is scheduled for Oct. 29.

The foosball table is ready for action in a Smith Hall Lounge. (Doug Hubley/ֲý College)

The foosball table is ready for action in a Smith Hall Lounge. (Doug Hubley/ֲý College)

Notes from a basement: Back on the sunny shores of Lake Andrews, the first student residents of post-renovation Smith and Wentworth Adams halls have settled in.

Smith will remain mostly empty until the majority of the student body returns to campus this weekend. But 50 or so first-years moved into Adams on Opening Day, Aug. 29, arriving among the 499 members of ֲý’ Class of 2020.

When it's complete, this sectional lounging unit in Smith Hall's basement will have counter seating along the backs of each sofa unit. Imagine the fun to be had with spitballs and popcorn during a binge-viewing session of films by Ingmar Bergman! (Doug Hubley/ֲý College)

When it’s complete, this sectional lounging unit in Smith Hall’s basement will have counter seating along the backs of each sofa unit. Imagine the fun to be had with spitballs and popcorn during a binge-viewing session of films by Ingmar Bergman! (Doug Hubley/ֲý College)

Opening Day came a week after another milestone for the dorms’ renovation: the issuance of the certificate of substantial completion for Smith and Adams by ֲý, general contractor Langford & Low, and architect Harriman Associates.

As we’ve previously written, the practical effect of substantial completion is that ֲý assumes authority over the buildings from the general contractor. But as we’ve seen with the Campus Avenue residences, substantial completion and even student occupancy don’t signal the end of work.

At Smith and Adams as at 55 and 65 Campus Ave., workers continue to make tweaks, repairs, and replacements revealed by the punch-list inspection process.

On Aug. 24, when Campus Construction Update stopped by for a look-see, the new lakeside entrance to Wentworth Adams Hall was all but complete, with access-system work to be done and the ceilings awaiting their full complement of tiles.

Completed tasks at Adams included the creation of a first-year study center in the basement; the upgrade of a first-floor suite now occupied by the residence director; and paint and light fixtures that bring new brilliance to the main corridors of the ground-level and street-level floors.

A new study lounge in the renovated basement of Smith Hall. Banquette seating is a design theme in the lounge spaces ֲý has created this year. (Doug Hubley/ֲý College)

A new study lounge in the renovated basement of Smith Hall. Banquette seating is a design theme in the lounge spaces ֲý has created this year. (Doug Hubley/ֲý College)

Next door, the transformation of Smith — especially its basement — was striking. The wall colors were on, most furniture in place, and the residence coordinator was already ensconced in her sunny basement abode.

The basement kitchen-lounge was ready for action. The furniture was a mix of formats including mid-sized tables, four-person high-tops with unusual shovel-shaped stools, and, across the aisle in a television lounge, a giant sectional with both sofa and counter seating. It was an elaborate system for lounging.

Down the corridor a large, well-lit study lounge straddled the aisle and, again, was furnished to accommodate all manner of seating preferences — from long banquettes to six-person tables, from paired soft chairs perfect for tête-à-têtes to tall loungers for solo thinkers.

Upstairs in the residential zone, Farnsworth showed off the new shower drains that, for the first time in this venerable building, limit one’s run-off to one’s own stall. (Previously, two stalls shared a drain.)

The individualized shower drains, which required some time to perfect, comprise a trough in each stall equipped with a decorative patterned-metal cover. The stalls are separated by a tiled berm. Hygiene and elegance too.

In the new and improved Smith Hall showers, fancy metalwork decorates the drain troughs and a tiled barrier ensures that bathers don't have to stand in each others' runoff. (Doug Hubley/ֲý College)

In the new and improved Smith Hall showers, fancy metalwork decorates the drain troughs and a tiled barrier ensures that bathers don’t have to stand in each others’ runoff. (Doug Hubley/ֲý College)

Looking at the overall project, Farnsworth had nothing but praise for Langford & Low, calling the Portland-based contractor “awesome.” Deadlines were tight: It was key to get the buildings to the point where the city could issue the certificates of occupancy (a precursor to substantial completion), because otherwise ֲý couldn’t use the buildings.

“They understood the goal of having this work done in time for the return of the students — there was no other place for the students to go.”

“We got everything done that needed to be done in time.”

Hey, that’s no way to say goodbye: Campus Construction Update welcomes your questions and comments about current, past, future, desirable, and imaginary construction at ֲý. Write to dhubley@bates.edu, putting “Campus Construction” or “Thanks for the memories” in the subject line. Or use the 21st-century commenting system below.

Mixed pavers cover the boathouse parking area. (Doug Hubley/ֲý College)

Mixed pavers cover the boathouse parking area. (Doug Hubley/ֲý College)

]]>
/news/2016/09/02/campus-construction-update-sept-2-2016/feed/ 0
Campus Construction Update: Aug. 12, 2016 /news/2016/08/10/campus-construction-update-aug-12-2016/ /news/2016/08/10/campus-construction-update-aug-12-2016/#respond Wed, 10 Aug 2016 20:04:53 +0000 /news/?p=102699 The four ֲý College construction projects that we've been following for months are all coming to fruition in the next few weeks.]]> The demolition of ֲý’ former boathouse is part of this week’s Campus Construction Update.
Campus Construction Update isn’t ready to surrender the hard hat and safety vest quite yet, but that day is coming soon. (The 8-foot ladder stays here!)
Workers install the door unit at the new rear entrance to Wentworth Adams Hall on Aug. 10, 2016. (Doug Hubley/ֲý College)

Workers install the door unit at the new rear entrance to Wentworth Adams Hall on Aug. 10, 2016. (Doug Hubley/ֲý College)

The four projects that we’ve been following since last spring (or, in the case of the Campus Life Project, since spring 2014) are all coming to fruition in the next few weeks — in time, naturally, for students’ arrival for the new academic year. Two of the projects are athletic facilities. The new playing surface for the Campus Avenue Field, home of ֲý field hockey, should be in place by Aug. 19. And ֲý’ new boathouse, in Greene, is scheduled for completion by Sept. 2. And two projects, involving four buildings in all, are residential. In one project, Smith and Wentworth Adams halls have been upgraded during the summer. The fourth, of course, is the brand-new ֲý dorms at 55 and 65 Campus Ave., which we looked at last week. Students will begin moving into all four buildings on Aug. 19.
The former Room 118 in Wentworth Adams Hall will soon be the vestibule for the dorm's new rear entrance, offering quick access to Lake Andrews. (Doug Hubley/ֲý College)

The former Room 118 in Wentworth Adams Hall will soon be the vestibule for the dorm’s new rear entrance, offering quick access to Lake Andrews. (Doug Hubley/ֲý College)

At Wentworth Adams, the excitement has focused on the lowest two stories. Being created on the ground floor are an entrance facilitating access to Lake Andrews; and a large study area supporting that floor’s new function as a first-year center. One flight up, a residence director’s apartment is taking the place of a student room. Meanwhile, Aug. 9 was the date scheduled for substantial completion of the Smith work, which was building-wide. Substantial completion meant, among other things, that ֲý folks could move freely in the building, giving project manager Paul Farnsworth and others 10 days to square things away before student occupancy. Smith’s basement has been extensively reworked, including a reconfigured floor plan and new heating infrastructure. Above ground, a makeover of student living space addresses both deferred maintenance issues and a so-called de-densification that’s halving the number of beds to 96. The other 96 are shifting to the new Campus Avenue residences. During an Aug. 2 tour of Smith with Farnsworth, things were hopping. Every building trade seemed to be represented, especially in the basement — carpenters, wallboard hangers, plumbers, HVAC technicians, security system technicians, tile installers, and electricians. The new boiler, clad in a white metal cover, was commissioned Aug. 4, a daylong test that included firing up the unit and circulating hot water through the radiators. (The renovation included the relocation of certain hot-water pipes upward an entire floor, from the ceiling of the basement to the ceiling of the first floor. Moving the pipes allows more natural light into the basement.) A different pipe job was also finished: extending the fire sprinkler pipes out to the middle of the student room ceilings. Formerly positioned near the walls, the sprinklers can now fully cover a room in the unlikely event of a fire.
160802_CCU_Smith_Boiler_3044_dlh

Heating technicians near the near Smith Hall boiler on Aug. 2, 2016. The heating system passed its operational test two days later. (Doug Hubley/ֲý College)

And another new system, the makeup air unit and heat exchanger that will serve Smith’s basement, introduced us to (yet another) building concept we’d never considered: makeup air. Makeup air? The possibilities were thought-provoking, but the story is really about energy efficiency. Exhaust fans like bathroom ventilators and the new range hood in Smith’s basement kitchen reduce air pressure in a building. This “negative pressure” pulls unconditioned outside air inside — not a good thing in colder months. So the makeup unit equalizes the pressure and, in cold weather, transfers heat from the exhaust air to the incoming air. Upstairs, painting of the hallways was in progress, with a few bedroom walls still to be done. Bedroom flooring was in place and corridor carpeting was being laid even as we passed through. Farnsworth pointed out that the flooring subcontractor, Paul G. White Interior Solutions, worked six-day weeks and brought in installers from out of state to keep the project on track. Finally in Smith, renovation of the 12 student bathrooms was nearly complete, incorporating new floor tiles and sinks; water-saving low-flow shower heads; and, for the first time in Smith, overhead lights in the toilet and shower stalls. Next door at Wentworth Adams, progress was most apparent on the new entrance, with the wall opening covered in plywood while awaiting the door unit’s arrival on the 10th. But the canopy roof over the entryway was finished and the area around it landscaped, with an eye toward enabling a backyard social milieu. In the vestibule, benches will encourage waiting for a friend, or enjoying the view even during inhospitable weather. A gas grill is on order, and Farnsworth is thinking about laying on a few Adirondack chairs. Encouraging students to hang out together, he said, “is what this is all about.”
The exterior wall coverings were in place on the front of ֲý' new boathouse by late July 2016. (Doug Hubley/ֲý College)

The exterior wall coverings were in place on the front of ֲý’ new boathouse by late July 2016. (Doug Hubley/ֲý College)

A Boathouse Raised, Another Razed: Granted that this series is dedicated to construction and not the opposite, we were nevertheless transfixed by the destruction of ֲý’ former boathouse on July 28. With its replacement going into service Sept. 1, time was up for the barn-like 1988 structure situated near the new facility on the Androscoggin River in Greene.
The ֲý rowing fleet was stored at Underhill Arena while the college was between boathouses in July 2016. (Doug Hubley/ֲý College)

The ֲý rowing fleet was stored at Underhill Arena while the college was between boathouses in July 2016. (Doug Hubley/ֲý College)

Operating an excavator for Wayne, Maine, construction firm C.H. Stevenson, Walter Davenport was an artist at the controls of the John Deere 160D that knocked down the old house — or at least its wooden frame, since the wall planks had been removed previously for re-use in the new boathouse. Davenport caressed the frame at each end of the building with the Deere’s metal claw. Then he softened up one side. Finally he drove around wiggling corner posts until the structure collapsed with a polite thump. Rowing coach Peter Steenstra witnessed the razing. “I’m proud of what we did with so little,” he said, referring to shortcomings in the old boathouse that had emerged as the rowing program grew. “And now it’s amazing how so little can somehow seem like so much.” Davenport and his Deere also put an end to a problem that cropped up at the start of the boathouse construction project, back in April: the discovery of rocks, really big rocks, that were in the way at the construction site. Removing them intact would have been prohibitively expensive, says ֲý project manager Henry Gillert. Incorporating them into the landscaping proved to be unworkable. But finally, Gillert says, a jackhammer mounted on an excavator’s boom — a so-called hoe ram — was used to break up the rocks, which Davenport loaded into dump trucks for disposal on the 28th.
Walter Davenport and his Deere excavator load the broken-up remains of large rocks that had posed something of a problem on the site of ֲý' new boathouse. (Doug Hubley/ֲý College)

Walter Davenport and his Deere excavator load the broken-up remains of large rocks that had posed something of a problem on the site of ֲý’ new boathouse. (Doug Hubley/ֲý College)

“They were really hard rocks, and we weren’t sure we were going to be able to do it,” says Gillert, “but they did it in one day. It was a huge win to be able to get rid of those at a reasonable cost.” At any rate, the new boathouse itself is right on schedule. Combining gray shingles, garnet clapboards, and white trim, much of the exterior wall covering is in place. The windows are finished. This week, plumbers and electricians have been doing terminal installations, e.g., faucets and light switches, and tiling experts are on task in locker rooms and bathrooms. Those wall planks from the old boathouse, freshly planed and finished, will be fitted as corridor wainscoting and ceiling accents starting next week. A key feature, the slick telescoping Focus Rack Systems boat racks, will arrive the week of the 22nd.
The GreenFields Ecocept layer on the Campus Avenue Field on Aug. 8, 2016. The colored bits are from ground-up recycled plastic bottles. (Doug Hubley/ֲý College)

The TenCate Ecocept layer on the Campus Avenue Field on Aug. 8, 2016. (Doug Hubley/ֲý College)

All Mixed Up: Finally on the athletics front, replacement of the Campus Avenue Field playing surface has resumed after a delay related in part to equipment troubles. The new turf, a highly regarded Dutch product called GreenFields TX, has two layers: a carpet of high-tech faux grass on top, and a shock-absorbent base that’s known generically as the elastic layer or e-layer, and in GreenFields parlance as the Ecocept layer, made by the Dutch firm TenCate. It consists of recycled rubber crumbs and chipped-up plastic bottles that are mixed with polyurethane glue right on site just prior to placement.
A crew for NET Sports of Saco, Maine, places the GreenFields TX Ecocept layer on ֲý' field hockey facility. (Doug Hubley/ֲý College)

A crew for NET Sports of Saco, Maine, places the GreenFields TX Ecocept layer on ֲý’ field hockey facility. (Doug Hubley/ֲý College)

That Ecocept layer was supposed to go down the third week of July. But the mixing machine that project contractor NET Sports Group of Saco, Maine, brought up from Texas was not performing to the satisfaction of the GreenFields supervisor on the scene. So NET bought a new mixer from Germany. Because irregularities in the Ecocept are transmitted to the playing surface, Gillert explains, the quality of that layer is critical to the playability of the field. Indeed, the NET Sports crew is so meticulous about laying the stuff that watching them work is like watching paint dry. “Our main objective is to get it in right, because we’re going to live with that field for 20 years,” Gillert says. Thanks to the new mixer, the Ecocept was successfully placed this week and the grassy GreenFields carpet is scheduled to arrive Aug. 12. Can we talk? Campus Construction Update welcomes queries and comments about current, past, and future construction at ֲý. Write to dhubley@bates.edu, putting “Campus Construction” or “Makeup air? Is that like makeup … never mind” in the subject line. Or use the comments system below.]]>
/news/2016/08/10/campus-construction-update-aug-12-2016/feed/ 0
Campus Construction Update: July 22, 2016 /news/2016/07/21/campus-construction-update-july-22-2016/ /news/2016/07/21/campus-construction-update-july-22-2016/#respond Thu, 21 Jul 2016 20:34:54 +0000 /news/?p=102399 As ֲý College's new varsity rowing boathouse comes closer and closer to completion, the old boathouse comes closer and closer to vanishing. ]]>

Topped with worn blue padding, the wooden boat racks were still in place in ֲý' 1988 boathouse on July 19, 2016, about a week before its scheduled demolition. (Doug Hubley/ֲý College)

Carpenters for R.S. Egenstafer Construction of Littleton, Maine, dismantling the old ֲý boathouse on July 19, 2016. (Doug Hubley/ֲý College)

The new ֲý boathouse seen through the wall framing of its 1988 predecessor. (Doug Hubley/ֲý College)

The ֲý boathouse on July 19, 2016. (Doug Hubley/ֲý College)

A padded cradle once used for storing ֲý racing shells lies discarded in the old boathouse. (Doug Hubley/ֲý College)

As ֲý’ new varsity rowing boathouse comes closer and closer to completion, the old boathouse comes closer and closer to vanishing. When we visited on July 19, the barn-like space was all but empty, with just a few wooden boat racks remaining and barely enough debris on the ground to catch our interest. The boats are stored on campus in Underhill Arena and the rowing teams’ other gear is stashed in a storage unit on the construction site.

Carpenters for R.S. Egenstafer Construction of Littleton, Maine, dismantling the old ֲý boathouse on July 19, 2016. (Doug Hubley/ֲý College)

Carpenters for R.S. Egenstafer Construction of Littleton, Maine, dismantling the old ֲý boathouse on July 19, 2016. (Doug Hubley/ֲý College)

The roof looked more or less intact, but the walls have been reduced to bare framing. The planks that once covered them have been sent to East Coast Millwork of Boothbay, Maine, for resurfacing and sizing, after which they’ll be re-used to finish walls inside the new boathouse.

It’s nice to know that something of the 1988 boathouse will live on in the 2016 edition.

And on July 28, what’s left of the old house “will just get knocked down, chopped up, and hauled away,” explains project manager Henry Gillert.

Uphill from the old boathouse and a bit further from the Androscoggin River sits the new boathouse. Thanks to Hahnel Brothers Co., of Lewiston, the roof was finished the second week of July. Hahnel put asphalt shingles on the boathouse proper and a heavy rubber-like membrane on the adjoining annex, which will contain lockers, showers, and the team room — all amenities the old house lacked.

The ֲý boathouse on July 19, 2016. (Doug Hubley/ֲý College)

The ֲý boathouse on July 19, 2016. (Doug Hubley/ֲý College)

Most windows are in place on both sections, including clustered units on the team room that face east toward the river and pointy ones up near the gables that cast a dramatic light into the boat-storage space.

The plywood walls have been coated with Typar breathable weather-protection membrane. (It’s a building product that, like the similar Tyvek, is likely named for a prominent figure in the Vulcan High Command. “May your building envelope live long and enable you to prosper.”)

And with the Typar in place, carpenters for R.S. Egenstafer Construction, based in the Aroostook County town of Littleton, Maine, will sheath the building with stained wooden shingles and garnet-painted clapboards.

Inside the boathouse, the installation of wallboard and insulation is well underway, accompanied by mechanical-electrical rough-ins — that is, the running of infrastructure like pipes and wires into a space without making final hookups. The walls can be closed up when those rough-ins have had their municipal inspection.

Topped with worn blue padding, the wooden boat racks were still in place in ֲý' 1988 boathouse on July 19, 2016, about a week before its scheduled demolition. (Doug Hubley/ֲý College)

Topped with worn blue padding, the wooden boat racks were still in place in ֲý’ 1988 boathouse on July 19, 2016, about a week before its scheduled demolition. (Doug Hubley/ֲý College)

All in all, Gillert says, “it’s really progressing very smoothly.”

Also in early July, a representative from the specialty boat-rack builder Focus Rack Systems of Nashville, Mich., visited to measure the boat storage space.

“That’s a very, very big deal,” says Gillert. Proper boat storage is a focus of concern for the rowing coach Peter Steenstra and his teams, as the lightly built vessels are quite vulnerable to damage. Dings that puncture a boat’s skin can admit moisture that will cause the hull to deteriorate.

The old racks were essentially padded pieces of wood mounted perpendicular to the boathouse walls. (There were also some padded hook-like boat cradles that hung from the ceiling on ropes. Steenstra has pointed out that the old house ended up storing three times as many boats as it was designed for.)

The Focus racks, instead, will have telescoping arms that function like drawers, making boat handling easier on both vessels and rowers. As one of the final stages of the boathouse construction, Focus will install the racks during the third week of August.

In other news from the Androscoggin’s shady banks, the project team has decided the fate of the boulders that surprised everyone when they turned up during foundation work. The big rocks will be broken up and hauled away.

The 1988 ֲý boathouse, at left, and the new facility, pictured on July 11, 2016. The Androscoggin River is behind the trees. (Doug Hubley/ֲý College)

The 1988 ֲý boathouse, at left, and the new facility, pictured on July 11, 2016. The Androscoggin River is behind the trees. (Doug Hubley/ֲý College)

Turf’s up: The summer’s other major athletics construction project, the replacement of artificial turf at Campus Avenue Field, was on hiatus earlier this week.

Workers finished grading the stone base for the new state-of-of-art GreenFields TX turf in mid-July. But the placement of the shock-absorbing TenCate Ecocept layer, which will underlie the grassy-looking playing surface, was delayed until specialized equipment could be delivered here from a job in Texas.

That gear has arrived and work was expected to begin today, July 22.

A Crooker Construction excavator handles rolls of AstroTurf that have been removed from Campus Avenue Field. GreenFields TX will replace the 16-year-old AstroTurf. (Doug Hubley/ֲý College)

A Crooker Construction excavator handles rolls of AstroTurf that have been removed from Campus Avenue Field. GreenFields TX will replace the 16-year-old AstroTurf. (Doug Hubley/ֲý College)

Nevertheless, the renovation of the ֲý field hockey team’s home field is expected to be complete by Aug. 3.

Like a giant pizza cutter, the circular blade on this front-end loader is slicing the Campus Avenue Field AstroTurf on July 6, 2016, prior to rolling it up for removal. (Doug Hubley/ֲý College)

Like a giant pizza cutter, the circular blade on this front-end loader is slicing the Campus Avenue Field AstroTurf on July 6, 2016, prior to rolling it up for removal. (Doug Hubley/ֲý College)

A team from Crooker Construction of Topsham, Maine, had cut up and removed the old AstroTurf at the Campus Avenue Field early in the month. ֲý was hoping to give reusable surface portions of the old turf, installed in 2000, to local schools, but none were reusable. The AstroTurf had been glued onto a shock-absorbing elastic layer, aka e-layer, of mixed asphalt, stone, and rubber, and that was some tough glue.

“Everything just came up as one solid piece,” says Gillert, whose project management portfolio includes the field hockey field as well as the boathouse.

Around the same time the AstroTurf was being peeled off Campus Avenue Field, AstroTurf LLC was filing for bankruptcy protection, in an action designed to protect an intended sale of the company. The firm was a pioneer in the field of artificial turf, and was also a bidder in the current project.

With some of the AstroTurf still in place on Campus Avenue Field, an excavator stacks rolls of the turf that have just been peeled off on July 6, 2016. (Doug Hubley/ֲý College)

With some of the AstroTurf still in place on Campus Avenue Field, an excavator stacks rolls of the turf that have just been peeled off on July 6, 2016. (Doug Hubley/ֲý College)

Talk about turf wars. The filing followed AstroTurf’s $30 million loss in a patent fight with the French company Tarkett. That company makes yet another turf for athletics: FieldTurf, which covers ֲý’ Garcelon Field as well as several NFL facilities.

Whatever happens next with AstroTurf the company, AstroTurf the product has left ֲý with its honor intact. “A lot of folks have said that we really got our money’s worth with that field,” Gillert notes.

He expects the same result from the GreenFields, made by a company based in the Netherlands. “It’s a great manufacturer with a great reputation,” he says. “Everybody’s really excited to see this new product come in.”

Can we talk? Campus Construction Update welcomes your questions and comments about current, past, and future construction at ֲý. Write to dhubley@bates.edu, putting “Campus Construction” or “Do the Vulcans use artificial turf?” in the subject line. Or use the 21st-century commenting system below.

]]>
/news/2016/07/21/campus-construction-update-july-22-2016/feed/ 0
Campus Construction Update: July 1, 2016 /news/2016/07/01/campus-construction-update-july-1-2016/ /news/2016/07/01/campus-construction-update-july-1-2016/#respond Fri, 01 Jul 2016 14:07:40 +0000 /news/?p=102037 The installation of an irrigation system began a remake of ֲý College's Campus Avenue Field that will include the installation of GreenFields TX turf. ]]>
The current Bobcat emblem on the new GreenFields TX turf will replace this outmoded likeness on the Campus Avenue Field. (Doug Hubley/ֲý College)

This outdated Bobcat likeness on the old AstroTurf surface will be refreshed when ֲý installs new GreenFields TX turf on the Campus Avenue Field. (Doug Hubley/ֲý College)

When Campus Construction Update learned that a new watering system was part of this summer’s project to replace the playing surface on ֲý’ field hockey facility, our journalistic reflexes started to bark. Why, they asked, would you irrigate artificial grass? Well, as it turns out, it’s standard in field hockey to soak the artificial turf for games and practices (in above-freezing temperatures, anyway). The reasons involve both the quality of play and the safety of the players, explains ֲý’ field hockey coach Danielle Ryder.
A crew from Thirsty Turf works on the Campus Avenue Field's new irrigation system on June 7, 2016. (Doug Hubley/ֲý College)

A crew from Thirsty Turf works on the Campus Avenue Field’s new irrigation system on June 7, 2016. (Doug Hubley/ֲý College)

“The water allows the ball to move at greater speeds with a consistent roll,” she says. “It also keeps the ball on the very top layer of the turf carpet, allowing players to easily maneuver their sticks around the ball.” The water reduces friction and therefore injuries, Ryder adds. “It plays a huge role in player safety. Imagine running full speed and falling across your living room rug. You’d walk away with some pretty bad rug burns, although we call it turf burn.” The installation of the irrigation system, by the Portland firm Thirsty Turf, began the remake of the Campus Avenue Field in early June. But most of the work happens during July — notably, the removal of the 16-year-old AstroTurf, leveling of the existing gravel substrate, and placement of the new turf, made by the Dutch company GreenFields and called GreenFields TX. AstroTurf removal begins the week of July 4, and the entire project should be done by Aug. 1. A few chores like the irrigation system are being handled by subcontractors, but the lead contractor is NET Sports Group of Saco, Maine — which, coincidentally, just installed TX at Syracuse University. New turf is overdue on Campus Avenue Field, Ryder says. Symptoms of wear on the AstroTurf include bald spots, notably in the highly trafficked shooting circle, and seams that are separating. In addition, the so-called e-layer, a shock-absorbing stratum of rubber chips, has become compressed and hard.
Campus Avenue Field and its 16-year-old AstroTurf. In addition to replacing the playing surface, this summer's renovation will entail placing new sod around the perimeter. (Doug Hubley/ֲý College)

In addition to replacing the 16-year-old AstroTurf surface, this summer’s renovations will entail placing new sod around the perimeter. (Doug Hubley/ֲý College)

There are also inconsistencies in the current surface, such as sewn-in markings, that make ball trajectories unpredictable. And the giant Bobcat emblem gets slippery when wet. “It’s tough because it’s right in the middle of the field,” says a member of the team, Caroline O’Reilly ’18 of Longmeadow, Mass. Most important, though, technology has marched on, and the GreenFields TX is simply a much better product than the poor old AstroTurf. The AstroTurf is nylon and the GreenFields is polypropylene, which is softer and therefore safer, explains Henry Gillert, who is managing the turf replacement for ֲý Facility Services. And TX has a better bounce and other playing characteristics — so much so that it was the field surface chosen for the 2014 Hockey World Cup. Gillert notes that Ryder and the project team interviewed four different manufacturers, including AstroTurf. “There are not a lot of GreenFields installations in the United States, but it seems to be far superior in many aspects, so we feel pretty confident about the decision,” he says. “It’s really going to be a great field for many years. The industry has changed so much since the AstroTurf installation — and it’s changing as we sit here. That’s how dynamic it is.” So what about that irrigation system? It will feature eight sprinkler heads around the field, three along each of the long sides and one on each of the short sides.
160519_CCU_AstroTurf-Hole_2028_dlh

Wearing of the green: A hole in the 16-year-old AstroTurf at ֲý’ Campus Avenue Field. (Doug Hubley/ֲý College)

Before games and at halftime, after a warning horn, the heads will pop up around the perimeter of the field and let fly. “It’ll provide a uniform coverage of water across the surface of the field,” Gillert says. “One of the criteria was that the system be able to saturate the field within the 10-minute halftime.” Each head, says Gillert, will be able to spray a 130-foot jet. And each will pump 350 gallons per minute at a time onto the GreenFields TX. “That’s a lot of water in one minute,” he says. Previously, Facility Services crews would deploy water cannons to wet the field before a game and again at half-time — a problematic arrangement because the water cannons had neither the volume nor the coverage patterns to drench the whole field. And the new system, Gillert adds, can be operated with a cellphone app. Can we talk? Campus Construction Update welcomes queries and comments about current, past, and future construction at ֲý. Write to dhubley@bates.edu, putting “Campus Construction” or “Down, you pesky journalistic instincts!” in the subject line. Or use the comments system below.
The focus of the 2016 Campus Avenue Field renovation is the replacement of AstroTurf installed in 2000. The Ecco Seawalkers will be around for a while longer, though. (Doug Hubley/ֲý College)

The focus of the 2016 Campus Avenue Field renovation is the replacement of AstroTurf installed in 2000. The Ecco Seawalkers will be around for a while longer, though. (Doug Hubley/ֲý College)

]]>
/news/2016/07/01/campus-construction-update-july-1-2016/feed/ 0
Celebrating a Goal /news/2009/05/01/celebrating-a-goal/ /news/2009/05/01/celebrating-a-goal/#respond Fri, 01 May 2009 15:58:17 +0000 http://batesviews.net/?p=3736 18-72wlax8895

Morgan Maciewicz ’10 celebrates a goal during a game against Colby. ֲý lost the game but earned the sixth seed in the NESCAC Championship.

]]>
/news/2009/05/01/celebrating-a-goal/feed/ 0
Sema Kazarian '11 /news/2008/09/29/kazarian/ /news/2008/09/29/kazarian/#respond Mon, 29 Sep 2008 16:00:03 +0000 http://batesthisweek.wordpress.com/?p=1455 72kazarian_3603

The ֲý field hockey team was in need of scoring entering last week, averaging only 1.00 goals per game. The Bobcats responded forcefully in a 1-1 week, defeating New England College 5-1 before losing at No. 10 Tufts by a 4-2 score. ֲý was the first team to score more than one goal on the powerful Jumbos.

Sophomore forward Sema Kazarian (Providence, R.I.) led the scoring breakthrough with three goals on the week — two against New England College and another against ֲý. Kazarian now leads the Bobcats with four goals for eight points.

ֲý takes on non-conference opponent Husson College on Wednesday at 5 p.m., before hosting Connecticut College Saturday at noon during Parents & Family Weekend.

]]>
/news/2008/09/29/kazarian/feed/ 0